skip to main | skip to sidebar

2B-2009-MOSMAN

Wednesday, September 30, 2009

water analysis

For the Djilimbardi site it is essential that we provide excellent water catchment systems and reserve water systems as well. Seeing as the site only receives rain for 3-4 months of the year during monsoon season, this rain needs to be captured and stored for about 8 months of the year. We have included 3 Freshwater tanks and 1 Greywater tank, which can work by themselves or if necessary in conjunction with the bore water system that is available on the site.
Posted by 2B-2009-Kimberley-Blake at 5:48 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Followers

Blog Archive

  • ▼  2009 (83)
    • ►  October (21)
    • ▼  September (25)
      • oppenheim testing
      • water analysis
      • minima
      • MINIMA PROJECT
      • Minima Project
      • MOSMAN 2 refining
      • MOSMAN 2 testing
      • MOSMAN 2 testing
      • MOSMAN 2 testing
      • MOSMAN 2 domus presentation
      • Mosman 3 Group progression!
      • Domus!
      • Minima!
      • DOMUS MODEL
      • MINIMA
      • 3D model refined
      • 3D model progress images
      • Model Progress, almost complete
      • Progress Model Photos
      • MINIMA
      • GROUP 5 DOMUS MODEL
      • MOSMAN 2 domus djilimbardi model
      • i can finally post stuff!
      • Idea generation
      • MOSMAN 2 design principals
    • ►  August (36)
    • ►  July (1)

Contributors

  • 2B-2009-ALEX-SAWTELL
  • 2B-2009-Blaise-Pascal
  • 2B-2009-Caroline-Marten
  • 2B-2009-Chris-Poulson
  • 2B-2009-Emile-Griffith
  • 2B-2009-Giles Smith
  • 2B-2009-Holly-Slater
  • 2B-2009-Jessica-Buchanan
  • 2B-2009-Jessica-Corbett
  • 2B-2009-Kimberley-Blake
  • 2B-2009-Nicholas-Peron
  • 2B-2009-Sarah-Callahan
  • 2B-2009-Steph-Abfalter
  • 2B-2009-Thomas-Sullivan
  • 2B-2009-Tyler-Peirce
  • 2B-2009-WeiJye-Lim
  • 2B-2009-Zehuan-Zhang
  • 2B-2009-Zele-Zhang
  • 2B-2009-Zhu-Xuanyi
  • 2B_2009_Johnny_Tselepis
  • bushTucker